Skip to content
Aarve Solar

Aarve Solar · Bengaluru and five states

Searching for the best solar installers near you?

If the site is in Bengaluru — or anywhere in Karnataka, Andhra Pradesh, Tamil Nadu, Telangana or Odisha — Aarve Solar is the one call that covers the roof, the pump, the perimeter and the lighting.

Book a free site survey

An engineer measures the site and gives you a written estimate.

Or call +91 90367 54985·Privacy policy

Why Aarve

What “best” should actually mean

Not the cheapest quote — the installer who sizes honestly, files the paperwork, and is still answering the phone in year seven.

  • Backed by a six-company group

    Solar is a twenty-five year commitment. Aarve Solar is one arm of the Aarve Group, with four offices across five states — the contractor that is still there in year seven.

  • PM Surya Ghar registered

    Residential on-grid rooftops qualify for up to ₹78,000 back. We are an eligible installer under the scheme and file the application for you.

  • One contractor, whole site

    The roof, the borewell pump, the perimeter fence, the lighting and the cameras — one survey, one contract, one team coming back for service.

How it works

Survey to commissioning, six steps

  1. Step 01

    Site survey

  2. Step 02

    Design and proposal

  3. Step 03

    Subsidy and DISCOM paperwork

  4. Step 04

    Installation

  5. Step 05

    Net metering and commissioning

  6. Step 06

    Service

Questions buyers ask

Before you compare quotes

The subsidy, the cost, the timeline and the service — answered the way we answer them on a survey visit.

How much subsidy do I get under PM Surya Ghar?

Residential on-grid rooftop systems get ₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW and above — credited after commissioning and inspection. Commercial and industrial connections sit outside the scheme; accelerated depreciation is usually the better lever there. We file the paperwork either way.

What does rooftop solar cost in Bengaluru?

Indicatively around ₹65,000 per kW for small residential systems before subsidy, less per kW as systems grow. The firm price comes from a free site survey — roof, shading and sanctioned load all move the number, which is why we put the estimate in writing.

How long does installation take?

Most residential rooftops are installed inside a working week once approvals are in. The DISCOM feasibility and net metering steps add government timelines around that — we run that file so you are not chasing it.

Do you handle net metering and DISCOM paperwork?

Yes — it is step three of our six-step process. The PM Surya Ghar application, the feasibility approval and the net metering file are handled in-house, and the system goes live after the DISCOM fits the bi-directional meter.

What happens after the system is installed?

A cleaning schedule, generation checks and warranty support, serviced from four offices across Karnataka, Andhra Pradesh, Tamil Nadu, Telangana and Odisha.

The survey is free. The comparison is easy after it.

An engineer measures the site and puts the system size, the price and the payback in writing — then you can compare us against anyone.

CallWhatsAppCalculate